MALIARI PRO / Guides

Kitchen and bathroom wall paint: what to specify

Choose a coating for the room's cleaning and moisture exposure. Separate washable paint, ventilation and areas that need a waterproofing system.

Interior illustration

Paint for a kitchen or bathroom should suit the surface, the cleaning routine and the moisture it will meet. The word "washable" does not by itself mean a product is right for every wet area. Explain where the wall is and how you use it day to day before any product is chosen.

Why each zone is described separately

A kitchen dining wall, the area beside a sink and a shower enclosure are three different situations. Identify steam, splashes and the areas that need frequent cleaning. Ask which coating or system is approved for each surface — decorative wall paint should never be assumed to replace waterproofing.

How steam differs from splashes

Steam spreads through the whole room and condenses on cold surfaces, so the ceiling and a far corner are affected too. A splash is local and calls for mechanical cleaning. The first is a ventilation question, the second a question of the coating's durability; both need checking separately.

Why choosing a sheen is not enough

The manufacturer's bathroom painting guide includes a matte product formulated for humid rooms. That is precisely what shows finish and intended use must be checked separately — a shinier paint is not automatically more moisture-resistant.

What questions belong in the brief

The specification should carry these answers:

  • Is this product suitable for this exact wall and exposure?
  • What cleaning is permitted, and when can it begin?
  • What preparation is needed around existing marks?
  • How will ventilation and room use be managed during the work?
  • Which zones are excluded from the painting scope?
  • Which primer is approved for this surface?

What conditions a wet room needs

Painting a wet room needs a dry, cooled surface: after a shower a wall often needs 24 hours. Humidity should be below 80% and the temperature between +5 °C and +30 °C. A second coat usually follows after 2-4 hours, while the first wet cleaning waits up to 28 days.

Why ventilation is part of the decision

Paint does not stop steam — only ventilation removes it. If a bathroom extractor does not work, or the window does not open, any coating will fail early. The ventilation question therefore belongs alongside the choice of product, not after it.

What to do if there is damp or mould

Do not build the decision around paint alone. See stains and damp and address the underlying issue before any cosmetic work. For a sound surface, compare matte and satin and discuss the wall painting scope.

This general guide was prepared with AI assistance. Technical sources are linked in the text; the specific product instructions and an assessment of the property take precedence over general examples.

Wet rooms and damp

Interior illustration
01

Wall painting in Tbilisi

Painting walls in apartments, homes and commercial spaces, with the surface preparation, colour and scope agreed before work begins.

Read more
Interior illustration
02

Wall preparation, levelling and putty in Tbilisi

Assess filling, levelling, sanding and primer before painting. Agree the actual preparation scope and desired finish for your walls.

Read more
Interior illustration
03

Ceiling painting in Tbilisi

Ceiling painting with assessment of cracks, staining, surface preparation, lighting and access before the job is agreed.

Read more

YOUR SPACE IS NEXT

Let's bring a new colour to your space.

Tell us about your project. The location, dimensions and current condition will help us understand the work.