Maliari Pro considers facade painting projects in Tbilisi after assessing the surface and the access. The coating system and the schedule depend on the building, the condition of its exterior and the requirements of the selected material. On a facade the weather is an equal party to the work: it decides when a coating may be applied at all.
What we need to assess
Send views of each side of the building, the approximate height and the known surface material. Show cracks, loose coating, staining and previous repairs. Note access restrictions and the neighbouring areas that will need protection — a courtyard, parking or the balconies on the floors below.
What determines the scope
These are agreed before any schedule is drawn up:
- The facade areas, cornices and details to be painted.
- Preparation and repairs included in the assessment.
- The exterior coating system and the approved colour.
- Access equipment — scaffold, platform or rope access.
- Protection arrangements and clearing up.
- Conditions that would require postponement.
What weather does a facade need
Most exterior paints are applied between +5 °C and +30 °C, with relative humidity below 80%. The surface has to be dry: after rain or washing, a wall often needs 24-48 hours. Working on a wall heated by direct sun dries the coating prematurely. See these temperature requirements.
Why area alone is not enough
A flat 300 m² wall and a facade of the same area carrying balconies and cornices are not the same job. Access often decides more than preparation does: erecting, dismantling and moving a scaffold is time in its own right. This is why a facade assessment ends with an inspection on site.
How the schedule is planned
A facade date is tied to the forecast and cannot be fixed rigidly. We agree working windows and the rule for how the schedule shifts if it rains. Read planning facade painting before committing to an inflexible date.
Quote and handover
Ask for an itemised quote showing labour, materials, access and preparation separately. Agree that completed sections will be inspected in stages — a correction after the scaffold comes down costs a great deal more. Send your project details to discuss the facade.